During underwater investigations in preparation for the construction of the outfall portion of the Wastewater Treatment Plant Upgrade, a ship’s hull was discovered. A sonar survey and subsequent dive has revealed that the wreck is located approximately 5m from the end of the existing pipe, which is approximately 200 metres off shore from the Wastewater Treatment Plant.
Over 150,000 Monthly Readers! 1 Million+ Across the entire FreePress Network.
Daily Docket for all Ontario Courts
Goderich Court Zoom Link OR https://zoom.us/join Meeting ID: 640 7440 6397 Passcode: 881382
Zoom links to all Ontario courts


